Skip to content

Installation · 7 min read

How Long Does Flooring Installation Take? A Day-by-Day Guide for the Lower Mainland

One room is often a one-day job; a whole main floor usually takes a few days, and stairs add their own time. How long flooring installation takes, day by day, and what makes a job run long.

Published

How long does flooring installation take? For most homes, less time than people expect. One average room of floating floor, like waterproof laminate or vinyl plank, is often done in a single day. A whole main floor usually takes a few days, and a full house closer to a week. What decides the timeline is rarely the new floor itself. It's what has to happen before it: taking the old floor out, getting the subfloor flat, and any stairs. Here's how long flooring installation takes in a Lower Mainland home, room by room and day by day.

Every home is different, so take these as a rough guide, not a promise. The real schedule for your job comes after a free on-site measure, once the old floor and the subfloor have been seen.

How long does flooring installation take per room?

As a rough guide, for one bedroom or living room of about 150 to 300 sq ft:

  • Waterproof laminate or luxury vinyl plank, floating: often about a day, including taking off and putting back the baseboards.
  • Engineered flooring, floating or glued: about a day to two. Glue-down takes longer, because the adhesive has to be spread and the boards set into it.
  • Solid hardwood, nail-down: often two days or more. Unfinished hardwood that's sanded and finished on site adds several more days for the coats to dry.
  • Carpet: usually part of a day per room once the floor is ready.

Small rooms aren't always quicker per square foot. Bathrooms, laundry rooms and closets are full of cuts around toilets, door frames and pipes, so they take longer than their size suggests.

How long to install flooring in a whole house

For a typical Lower Mainland townhouse or detached home, here's roughly how the work stacks up:

  • Main floor only (living, dining, kitchen, hallway), around 600 to 900 sq ft of floating floor: usually two to four days.
  • A full house, around 1,500 to 2,500 sq ft across two or three levels: often a week or more, longer with stairs or hardwood.
  • A basement suite: often two to three days, depending on how flat the concrete slab is.
Dark wide-plank wood floor running through an open living and dining room to the front entry, after flooring installation
A dark wide-plank floor running through an open living and dining room, from one of Danny's jobs. Open main floors like this go quickly: long, uninterrupted runs mean fewer cuts.From our Our Work gallery

Flooring installation day by day

Here's what a typical replacement job looks like when the old carpet or laminate comes out and new waterproof laminate or vinyl plank goes in:

  • Day 1: removal. Baseboards come off carefully so they can go back on, the old floor and underlay come out, staples and tack strips are pulled, and the subfloor is cleaned.
  • Day 1 or 2: subfloor check and levelling. High spots are ground down, low spots filled. Patching compound needs time to dry before anything goes over it.
  • Day 2 to 3: installation. Underlay, then the new floor, room by room, with transitions at the doorways.
  • Last day: baseboards back on (or new ones), touch-ups, clean-up and a walk-through with you.

Tile is the one that changes the plan. Taking out ceramic tile and grinding the thinset off the subfloor is slow, dusty work, and it can easily add a day or two before the new floor can start. Our post on putting new flooring over old flooring covers when it can stay and when it has to come up.

From a Maple Ridge customer

“I called WoodPro Flooring based on their google reviews to inquire about getting vinyl plank flooring installed in my basement. Danny answered, was very friendly, and we discussed the proposed job. I had already purchased the flooring and was just looking for the best installer possible (and of course at a fair price!) He asked if I could send him some photos and a quick video of the area to be done, which I did along with providing the square footage, and then he promptly sent me a quote which I found to be extremely fair. Luckily for me, since my job was on the smaller side and could be done in 1 day, he was able to squeeze me in 3 days later between some larger jobs! Danny and his brother Vlad showed up on time as promised and ready to work. We discussed a few minor details in person off the bat and then I got out of their way to let the magic happen. By dinner time I had a perfectly installed floor! The guys did a great job. The install looks as pro as I've ever seen any floor done, We couldn't be happier! Danny and Vlad were very polite and a pleasure to have working in our home. 5 Stars all around! I would not hesitate to recommend them to any of my friends and family.”

Matt Google review

How long do stairs take?

Stairs are slow on purpose. Every tread and riser is measured, cut and fitted on its own, and square nosings are built and fitted step by step. A straight flight of about 13 to 15 steps often takes a full day or more on its own, and curved or winding stairs take longer. If your job includes custom stairs, plan for them on top of the floor time. Our guide to what it costs to redo stairs explains what's involved.

Light wood-look stair treads with square nosings and white risers, matching the new floor at the bottom of the stairs
Stairs with square nosings matched to the new floor, from one of Danny's jobs, with the saw still set up outside. Each step is cut and fitted on its own, which is why stairs take longer than the floors around them.From our Our Work gallery

What can make a flooring job take longer?

  • A subfloor that isn't flat. Most floating floors need the subfloor within a tight tolerance, and a dip or hump has to be fixed first. It's the most common surprise once the old floor is up. See why you should never skip levelling.
  • Hidden damage: soft or water-damaged plywood, old glued-down layers, or a leak found under a bathroom or laundry floor.
  • Old tile and thinset, which take far longer to remove than carpet or laminate.
  • Furniture and appliances that still need moving.
  • Material that has to acclimate. Some floors, especially wood, need to sit in the house for a few days before they go down. Check the maker's instructions.
  • Concrete slabs in basements, which may need a moisture barrier and extra levelling.

How to get your home ready for flooring installation

  • Clear the rooms of small items, breakables and anything stored on the floor.
  • Ask ahead about moving furniture and appliances, and who's doing it.
  • Plan where pets and kids will be while the work is going on.
  • Expect some noise and dust, especially on removal day.
  • Make sure the flooring is picked out and on site in time, so the job doesn't stop halfway.

Can I stay home during flooring installation?

Usually, yes. With floating floors, most people stay home and the work moves room by room. On a whole-house job you may lose the use of a room or two at a time. Glue-down floors and finishing unfinished hardwood are different: adhesives and finishes need time to cure, and you may need to stay off those floors, or out of that part of the house, for a while.

Can I walk on new floors right away?

Floating laminate and vinyl plank can usually be walked on as soon as they're down. Glue-down floors and site-finished hardwood need curing time first, often a day or more before light foot traffic and longer before furniture goes back. Your installer and the floor's maker will tell you how long for your floor.

Get a real timeline for your floors

The best way to know how long your job will take is to have the old floor and the subfloor looked at. Danny will come out, look at what you have, and tell you plainly how many days to plan for, room by room. Call (604) 787-5557 to book a free on-site measure, or see finished floors in Our Work. We work across the Lower Mainland and Fraser Valley: Maple Ridge, Pitt Meadows, Mission, Langley, Surrey, Coquitlam, Port Coquitlam, Port Moody, Burnaby and New Westminster.

Free Estimate

Let's talk about your floor.

Call (604) 787-5557 or request a Free Estimate online. The on-site measure is free, there's no obligation, and you'll usually hear back the same day.

Call Email